Telecom today has penetrated much deeper into India in comparison to electricity. Network availability is of prime importance to any telecom operator. However this is quite challenging owing primarily to non availability of good quality grid power supply at remote locations. Thus Indian telecom relies on diesel generator (DG) sets to provide greater than 99.95 per cent uninterrupted power uptime of telecom service, as these are the most reliable commercially available energy source. Despite availability of this source for many years there are multiple challenges in maintaining the network running, like:

  • Frequent diesel filling at remote location
  • Regular maintenance for 100 per cent uptime of DG sets
  • Variable load during the day
Load at telecom site generally comprises of equipment load, battery charging load and air conditioner load. With new generation base transreceiver sites (BTS) requirement of air-conditioner is going down and thus key load is only battery and BTS equipment. Most of the telecom sites are equipped with lead acid batteries, for which power requirement keeps on reducing with increase in battery state of charging. Also BTS load keeps on changing in line with usage of voice and data. Unlike battery bank load which changes from full load to negligible (100 per cent to 0) the variation in BTS load is around 40 per cent from peak to trough. Combining these two the peak load requirement at telecom site is around four to five times of minimum load requirement.

Due to this high variation in load requirement, it becomes very difficult to optimally size the DG sets. Ideally DG sets should be run at 60-80 per cent of the rated capacity at which the diesel engine delivers the maximum efficiency but in telecom sites DG sets are sized to meet the peak requirement which runs at reduced efficiency during the low load times.

Revised

To meet this challenge of load variation and poor efficiency a solution has been developed along with DG OEM which helps in keeping the efficiency curve almost flat, i.e highest efficiency irrespective of load. This is done by electronically controlling the speed of the engine depending upon the load unlike conventional DG which runs at fixed speed irrespective of load.

Graph_2

This resulted into variable frequency AC power which is converted into DC power using the power electronics equipment available at telecom site.This has been done due to the fact that all telecom equipment runs on DC power.

Graph_3

Lower speed operation of DG sets results in high efficiency in DG sets which means lower diesel consumption and hence this technology helped telecom companies to meet all three challenges related with DG operations. i.e

  1. Lower diesel consumption – lower diesel filling cycle
  2. Lower speed helped in lower wear and tear and higher uptime of DG set along with less noise
  3. High efficiency at all load points